Weekly report, week __

Sample project · six villas · prepared by the site project manager · Forward this page freely

Week ending
__ / __ / ____
Programme
On plan / __ days
Variations
__ approved in writing
Weather float used
__ days, absorbed by us

This week: structure complete on villas 01–02; set-out checked on villa 05. Rebar cover on villa 03 measured at 45 mm and the hold point signed; open actions listed below with owners.

01Progress

Progress by villa

VillaStageProgressLast hold point
01Structure
Cover checked, signed
02Structure
Cover checked, signed
03Structure · ground-floor slab
Rebar cover 45 mm measured (40–50 mm) · H signed by site PM, Tue · photo R-03-117 · cube samples cast, lab result pending
04Foundations
Set-out ±10 mm, signed
05Setting out
Set-out ±10 mm, signed
06Not started
—
02Evidence

Photographs this week

Aerial view of a Paradigma site at structure stage.
Weekly aerial. Example: another Paradigma site at structure stage.
Rebar and formwork before a pour.
Rebar cover before the pour, villa 03. Example photograph from a Paradigma site.
Inspectors checking teak joinery.
Joinery checked against the finishing sheet before sign-off.
03Owners

Open actions

ActionOwnerDue
Cube test result, villa 03 ground-floor slabSite PM__
Architect to confirm stone sampleArchitect__
Cube certificates, pours __ and __, to quality packQuality__
04Ahead

Next week

  • Foundations villa 04; set-out villa 06
  • Site meeting with minutes and open actions
  • Live video walk of any stage, on request

Sample layout, illustrative. Each real report is sent weekly with photographs and video, the site-meeting minutes and open actions. A principal attends an inspection every month.